The taller a wall is the further below ground level it should be set.
Put retaining wall on concrete or gravel.
Basic retaining wall installation step 1.
Crucial for supporting the rest of the wall a good base is made of compacted soil and at least a six inch layer of compacted sand and gravel.
Of compacted base 1 in.
Avoid having downspouts pointed at the retaining wall and if it s against the house keep soil and mulch well below the siding.
A retaining wall is a practical outdoor feature that can help keep your yard in top form but it s often overlooked or misunderstood.
How to build a concrete wall figure a.
After you finish the first course fill the space between your retaining wall and.
We go about 6 8 deep behind the wall with loose rock usually crushed granite and up to the second row from the top.
The following points need to be considered when planning your retaining wall installation.
In its most basic form it s a structure that holds soil in.
Of leveling sand and half the height of the first course of blocks.
If needed reposition it using additional.
Excavation leveling pad.
Your retaining wall design will determine how you mark the area.
Position your first block and use a standard level to make sure it s even.
Walls over 4 foot should use geo grid fabric different block designs limit allowable height use filter fabric over wet or dry soil then cover with gravel.
To mark a free form layout use a rope or hose to outline the shape.
Tall wall excavate a trench deep enough to accommodate 4 to 6 in.
Rather than messing around with mortar they lay the walls down like lego pieces using concrete while it s still in the bag.
For diy purposes opt for manufactured blocks that are.
Continue laying your first course of blocks making sure to check that every block is level.
Building a retaining wall in the conventional ways is not a trivial matter.
Use crushed stone behind the wall loose gravel and stones don t hold water like soil does.
The leveling pad is the first piece in constructing a stable wall that will last for.
The first course of block that you lay is known as the base course.
Second a retaining wall must have properly compacted backfill.
Base course drainage pipe.
The base of a retaining wall should be set below ground level.
Soil holds water so the dirt will expand and contract during winter thus pushing on the wall and eventually toppling it over.
That s right the idea is that.
Follow the block manufacturer s instructions for wall height limits.